The floor...
material...
Oh my...
I got it wrong again.
Cut!
Hi, it's Lucy with Campingcarjoa.
If you saw our last episode
You know our side panels...
Oops!
We took out our side panels and floor.
Today
We'll finish the floor insulation.
After we removed the bolts from the floor.
There are holes in our floor.
Before we install the subfloor
the holes we aren't going to use
Need to be plugged up.
So that's what we're doing now.
Let me show you how we're going to do it.
First
Tada!
We use 10 won coins.
Along with silicon to plug them.
With the remaining holes
The subfloor and the subfloor mounts
Will be bolted down to the floor.
So these won't be plugged.
Also these bolts that are sticking out
When we install the plywood subfloor
Will also be used.
Let's plug a hold with this 10 won coin.
Oh... it's not easy.
Just like this.
Just like frosting a cake.
Make it lump up a little.
It looks nice if it oozes out a little.
Now the 10 won coin.
Press it down.
Just like that.
But...
Failure!
I'm going to add some more.
It didn't come out the way I wanted it.
After adding a bit more
Oh it's not easy one handed while filming.
It's all over my hands.
Gently press it down.
And this is the way I want it.
Just like this.
So we finished plugging the holes with silicon and coins.
Let me show you.
The job is done.
Just have to wait for it to set.
Try not to step on them.
Being careful not to touch them.
I was waiting for them to set.
But while I was cleaning up
I hit some.
So I secured them with aluminum tape.
Normally you don't want aluminum against steel.
But the floor is painted.
So we're using the aluminum tape.
Yesterday, we plugged up the holes.
Today we plan to install the subfloor.
It was raining so we got a late start.
So we'll need a little luck to finish the job today.
Let's hurry and start!
We were all set up to start.
And it suddenly started pouring.
Can you see the rain on Tubi?
We were frantically putting everything back in the van.
It look like the rain has stopped for now.
So now...
It's time...
To cut out the subfloor.
We had the plywood staked on top of each other
While I was cutting.
Even though I double checked.
While cutting
I cut into the second board a little.
For the floor.
Before installing the subfloor
We need to install some mounts.
So I've been cutting them out.
Tubi's floor...
The floor...
Isn't all the same shape.
Take a look.
I cut these pieces out.
They have to be custom fit.
So I'm testing their fit.
A little later
The subfloor
Will be screwed down to these mounts.
On to the next step.
The mounts I cut ealier
Will be bolted down with the existing bolts.
So I tested a couple of them.
This hole was a failure.
This is the second attempt.
And it fits.
It doesn't stick out.
It's flush with the board.
You can see the rest of the mounts.
We tested this one too.
Now we have to prepare the rest of the mount.
While working...
We're in trouble.
It started pouring rain again
So even though we didn't do much today.
We have to wrap things up.
So...
Tomorrow we'll have to finish up.
I'm going to close up Tubi.
And get out of here!
Bye!